Swivel-EAZ Polyurethane
Wheel
Features & Benefits:
- They are made with high performance non-marking polyurethane
tires capable of speeds up to 3 M.P.H. on smooth floors with no
obstructions or shockloads. In most applications, at a reduced speed, these
wheels have an even higher carrying capacity.
- Each wheel has two independent rotating surfaces which enhance
capacity and swivel ease.
- They are ergonomically designed to minimize the force required
to initially start an object as well as the force required to keep it in
motion.
- They improve safety for your employees by reducing the risk of
injury.
- The heavy duty aluminum centers are equipped with extra large
sealed precision ball bearings which require NO maintenance.
- These wheels have a higher carrying capacity and roll easier
than any other polyurethane wheel of the same diameter having the same size
footprint and hardness.
|
 |
Model B15L
& B30L Caster Bracket
Features & Benefits:
- The caster brackets have a capacity rating based on a speed of
up to 3 M.P.H. on smooth floors with no obstructions or shockloads.
- The Extra Long Lead ( offset ) reduces
vibration and noise in a power towed application and makes the swivel
caster turn more easily when manually moved.
- Ergonomically designed to
minimize the force required to initially start as well as to keep equipment
rolling.
- The swivel bearing for these two caster brackets consists of
Two patented precision machined and hardened raceways. The upper raceway
is load bearing, while the lower raceway is thrust bearing. Other brands offer
only a single row of balls.
- There is No Center Pin to bend or brake.
- The swivel has a threaded 45º angle grease fitting for
easy maintenance.
- The caster brackets are zinc plated for an attractive and
lasting finish.
|
When you make a value
analysis, it is these features & benefits that, in our opinion, make this
caster the finest ever made. The slightly higher initial cost is more than
offset by its performance and long service life! Why invest in
these casters? Because, day in, day out, week by week, and year by year the
savings in operation pile up - maximum loads at minimum effort - no replacement
for years. Try a set. You will be immediately amazed at the noticeable
difference.
|
| B15L Flat Tread |
 Black - Softest 8" shown in photo |
 Red - Slightly
Harder 8" shown in photo |
 Blue - Fairly
Hard 8" shown in photo |
| Standard Mounting Plate - 4" x 4 1/2" |
 |
| We do NOT include mounting Hardware. |
|
|
| B30L Flat Tread |
 Black - Softest 8" shown in photo |
 Red - Slightly
Harder 8" shown in photo |
 Blue - Fairly
Hard 8" shown in photo |
| Standard Mounting Plate - 4 1/2" x 6
1/4" |
 |
| We do NOT include mounting Hardware. |
|
|